Wormley School Condominiums

The Wormley School

RECONFIGURING HISTORY: A state-of-the-art radiant heating comfort system breathes a new standard of living into a famed Washington, D.C., school-building-turned-residential-development, thanks to the cooperative and innovative efforts of its professional construction team.

Georgetown, Washington DC / 7 condos, 1,500-4,500 sf / mechanical package including radiant floor heat, ventilation, central boiler plant, and snowmelt

Cunningham + Quill Architects

Case Study

Dan Foley of Foley Mechanical in the mechanical room in the newly renovated Wormley School building.

Dan Foley of Foley Mechanical in the mechanical room in the newly renovated Wormley School building.

 

Air conditioning equipment on the roof at Wormley School.

Air conditioning equipment on the roof at Wormley School.

 

Uponor TruFLOW Manifold

Uponor TruFLOW Manifold

 

Chris Morrison (from left) of Cunningham Quill Architects, Steve Kay of Encore Development and Dan Foley of Foley Mechanical inside the Wormley School building.

Chris Morrison (from left) of Cunningham Quill Architects, Steve Kay of Encore Development and Dan Foley of Foley Mechanical inside the Wormley School building.

 

Wormley boiler room

Wormley boiler room

Leesburg Estate

Leesburg, Virginia / 28,000 sf / commercial mechanical package

including four boilers, two domestic hot water tanks, three commercial chillers,

radiant floor heat, wine chiller, commercial steam humidifiers,

HEPA filtration, energy recovery ventilators, communicating thermostat system

Passive Home

Bethesda, Maryland / 4,200 sf new residential construction /

unique mechanical system including variable refrigerant

flow system, high efficiency boiler, indirect domestic hot water, two energy recovery ventilators,

high efficiency filtration, passive ground loop to temper fresh air / Peabody Architects